We were invited by the client to change his existing electric boiler which was over 30 years old within his property in Kimbolton. The unit was tired and in need of replacement. It was also uneconomical to run in today’s climate.
We surveyed the property and discussed fully the client’s requirements to come to the conclusion that the best way forward was to fit him a new electric boiler based on what was already installed.
The original installation had a 3 Phase electric boiler and we recommended this to be replaced with another 3 Phase 24kw electric boiler allowing enough capacity to not only heat the house, but the hot water as well. At the same time, we recommended replacement of the cylinder to allow fitment of a modern, unvented cylinder. This allowed the removal of all the stored water within the loft space, and any shower pumps within the property. This reduces your liability under insurance from the storage point of view and reduces noise within the property when showers are in use.
We put our proposal forward to the client along with costings which were accepted and we then moved forward to installation. The first thing to do was to remove the existing boiler and then re-fit the new boiler in the cupboard that the original boiler came out of. This required modification of the pipework to allow fitment and fitment of new controls – that’s the picture of the boiler on the wall. We then removed the existing cylinder, modified the pipework as necessary in the airing cupboard and fitted the unvented cylinder including a discharge pipe to allow the house to be updated to a modern installation which gives plenty of hot water and at the same time allowing for a much more economical installation when it comes to running costs.
The client was over the moon with the results and not only did we reduce his electricity bills, but we gave him a far superior supply of water and the heating was far more effective in its use too.
by willowgo
Being recommended installers by a heating company our name was passed to our client in Kimbolton who is looking for his existing electric boiler to be removed to free up space within the kitchen for a future kitchen replacement project. Having examined the existing installation, looking through all the possibilities we came up with the solution of hanging the boiler in the airing cupboard above the cylinder and replacing the existing cylinder with a larger cylinder with better insulation.
Having put together our proposal the customer examined it and decided to move forward with it. We then attended the property and removed the existing boiler, modified all the pipework within the cupboard where it was originally sited, then installed the new boiler and cylinder in the airing cupboard, including all modification of pipework and new controls. The customer was very satisfied with the install as it reduced his overall running costs for the installation, as in this instance because the house was of a different layout, we could recommend a smaller boiler. We could recommend going from a single Phase to a 3 Phase boiler which he originally had. This reduced his electrical usage and at the same time allowed for a much more economical system within the property.